Menu

ME-LE Biogas

References

In the following we are presenting a part of our project portfolio:


Biomethane biogas plant in Torgelow (in construction):

  • Nominal power capacity: 700 Nm³/h biomethane
  • Commissioning in the third quarter of 2017
  • Construction work, Implementation of the digestion line and integration of the storage tanks for the biogas as the general contractor

Biomethane biogas plant Thierbach:

  • Nominal power capacity: 700 Nm³/h biomethane
  • Commissioning in the first quarter 2016
  • Implementation of the digestion line as the general contractor
  • Operation management by ME-LE Biogas GmbH

Biogas plant in Blumenthal:

  • Nominal power capacity: 300 KW/h electrical power
  • Commissioning in the fourth quarter 2014
  • 90 % of the substrates are byproducts and residues from livestock farming like slurry and manure

Biogas plant Blumberg:

  • Nominal power capacity: 605 KW/h electrical power
  • Commissioning in the third quarter 2013
  • 65 % of the substrates are byproducts and residues from livestock farming like slurry
  • Construction of the biogas plant as the general contractor
  • Operation management by ME-LE Biogas GmbH

If you have further requirements in terms of our realized biogas plants and further biogas plants in operation, do not hesitate to request further information.

Address

  • Eggesiner Str. 9c
  • 17358 Torgelow
  • Germany
  • Telefon: +49 (0) 3976 / 434 390
  • Telefax: +49 (0) 3976 / 434 399
  • E-Mail: biogas@me-le.de
This site uses cookies for better usability. To view maps and videos, Google Maps or Youtube are embedded. To ensure spam protection for requests, this site uses Google ReCAPTCHA. I agree with the use of these services.
More information Ok